DPRK Premier Pak Pong Ju made a field survey of the Taean Heavy Machine Complex.
He looked round various production processes to learn about the technical specifications of custom-built equipment and their processing and assembling. Then he held a consultative meeting.
It discussed issues arising in increasing the production of custom-built equipment and improving their performance.
Meanwhile, he went round the construction site of a mushroom farm and consulted a measure for hastening the construction.
Touring various areas of South Hwanghae Province, he highlighted the importance of preventing the drought.